← Asia-Pacific data centers · All sites · South Korea
Sourced site record, every fact links to its page
Naver Gak Sejong:data center in Sejong, South Korea.
Naver Gak Sejong is an operating data center in Sejong, South Korea, listed under Naver Cloud. Capacity is 270 MW according to NAVER Corp.. 2024 to 2026 satellite: little change (-5 to +3 pts). Real Assets links 4 source pages, including NAVER Corp., Brookfield Asset Management (SEC 8-K Ex. 99.1).
Open this site on the map View the full site recordoperating data center · 4 linked sources
- Naver Cloud
- Sejong
- South Korea
Approximate position and South Korea peer sites (the exact position needs sign-in)
Facts on record
- OperatorNaver Cloud
- City and countrySejong, South Korea
- Statusoperating
- Capacity270 MW, as stated by NAVER Corp.
- Expected completionNot recorded
- 2024 vs 2026 satelliteLittle roof change, (-5 to +3 pts, 2024 to 2026), 27 January 2024 to 27 November 2026
- Sources linked4 from 2 publishers
- Record updated27 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Deals recorded on this site🔒 1 deal
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
South Korea has 106 data centers on record in Real Assets, with 799.1 MW reported as operating and 1.52 GW not yet operating (figures stated for 45 of 106 sites). Naver Gak Sejong is one of them.
Naver Cloud has 2 data centers in Asia-Pacific with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 27 November 2026; this page was built on 28 November 2026 at 09:41 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- NAVER’s Second IDC, “GAK Sejong,” Commences Operations, Aspiring to Emerge as a Global Hub Propelling Future Industries | NAVER Corp.
NAVER Corp., navercorp.comWeb page - NAVER, NVIDIA and Brookfield announce expansion of Korea AI factory data center infrastructure to 200 MW
Brookfield Asset Management (SEC 8-K Ex. 99.1), sec.gov, published 27 July 2026Web page - 2 additional source filings & extracted fact citations for Naver Gak Sejong
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
4 sources on record; 2 shown above and 2 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (27 January 2024 to 27 November 2026), Naver Gak Sejong shows little change in roofed area with a roofed-share shift of -5 to +3 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All Asia-Pacific 2024 vs 2026 satellite-tracked sites
More Naver Cloud data centers in South Korea
- Naver Gak Chuncheon Data Center
Chuncheon, South Korea, operatingNot recorded
Other data centers in South Korea
- LG Uplus Paju AI Data Center
Paju, South Korea, under construction200 MW - SK-AWS AI Data Center Ulsan
Ulsan, South Korea, under construction103 MW - D&R Partners Asan Eumbong AI Data Center (아산 음봉 AI 데이터센터)
Asan, South Korea, planned100 MW - EFD Dangjin Songsan 2 AI Data Center (당진 송산2일반산단 AI 데이터센터)
Dangjin, South Korea, planned100 MW - Metacomplex Uijeongbu AI Data Center (메타컴플렉스 의정부 AI 데이터센터)
Uijeongbu, South Korea, planned100 MW - AWS Incheon Data Center
Incheon, South Korea, planned96 MW
Full site dossier & Asia-Pacific dataset
Open Naver Gak Sejong and 744 other data centers
This page is the public summary for Naver Gak Sejong in Sejong, South Korea. Sign in to see its full record: 4 source pages and 1 recorded deal.
- Naver Gak Sejong on the interactive map, with the sites around it
- All 4 linked source pages
- 1 recorded deal on this site
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Naver Gak Sejong?
Naver Gak Sejong is recorded under Naver Cloud. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Naver Gak Sejong?
In Sejong, South Korea. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Naver Gak Sejong have?
270 MW, as stated by NAVER Corp.. Operating capacity today is not recorded.
Is Naver Gak Sejong under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (27 January 2024 to 27 November 2026), Naver Gak Sejong shows little change in roofed area with a roofed-share shift of -5 to +3 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 4 linked pages by NAVER Corp., Brookfield Asset Management (SEC 8-K Ex. 99.1). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.