AnalystAIReal Assets Start the 3-day preview

← Asia-Pacific data centers · All sites · Singapore · Jurong, Tuas

Sourced site record, every fact links to its page

Jurong Island Low-Carbon Data Centre Park:data center in Jurong, Tuas, Singapore.

Jurong Island Low-Carbon Data Centre Park is a planned data center in Jurong, Tuas, Singapore, listed under JTC. Planned capacity is 700 MW. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 2 source pages, including edb.gov.sg, jtc.gov.sg.

Open this site on the map View the full site record
Jurong, Tuas, SingaporeJTC
700 MW

planned data center · 2 linked sources

  • JTC
  • Jurong, Tuas
  • Singapore
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Singapore peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
700 MWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorJTC
  • City and countryJurong, Tuas, Singapore
  • Statusplanned
  • Planned capacity700 MW
  • Expected completionNot recorded
  • 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 19 February 2024 to 31 October 2026
  • Sources linked2 from 2 publishers
  • Record updated20 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Singapore has 59 data centers on record in Real Assets, with 1.08 GW reported as operating and 938 MW not yet operating. Jurong Island Low-Carbon Data Centre Park is one of them.

JTC has 1 data center in Asia-Pacific with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

2 sources on record. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open Jurong Island Low-Carbon Data Centre Park's record: 2 source pages - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Dated 10 m satellite passes are stored for Jurong Island Low-Carbon Data Centre Park (19 February 2024 to 31 October 2026) for before-and-after comparison in the workspace.

Open 2024 vs 2026 satellite slider · All Asia-Pacific 2024 vs 2026 satellite-tracked sites

Other data centers in Singapore

Full site dossier & Asia-Pacific dataset

Open Jurong Island Low-Carbon Data Centre Park and 703 other data centers

This page is the public summary for Jurong Island Low-Carbon Data Centre Park in Jurong, Tuas, Singapore. Sign in to see its full record: 2 source pages.

  • Jurong Island Low-Carbon Data Centre Park on the interactive map, with the sites around it
  • All 2 linked source pages

or continue in one click

Instant sign-in with a 6-digit email code or single sign-on. No password required.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Jurong Island Low-Carbon Data Centre Park?

Jurong Island Low-Carbon Data Centre Park is recorded under JTC. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Jurong Island Low-Carbon Data Centre Park?

In Jurong, Tuas, Singapore. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Jurong Island Low-Carbon Data Centre Park have?

700 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Is Jurong Island Low-Carbon Data Centre Park under construction or growing on satellite imagery?

Dated 10 m satellite passes are stored for Jurong Island Low-Carbon Data Centre Park (19 February 2024 to 31 October 2026) for before-and-after comparison in the workspace.

Where does this information come from?

From 2 linked pages by edb.gov.sg, jtc.gov.sg. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.