AnalystAIReal Assets Start free trial

← Asia-Pacific data centers · All sites · Japan · Inzai

Sourced site record, every fact links to its page

Google Inzai Data Center Campus (Chiba):data center in Inzai, Japan.

Google Inzai Data Center Campus (Chiba) is an operating data center in Inzai, Japan, listed under Google. Capacity is 60 MW according to APAC Operator Filings & Directory Census. Real Assets links 1 source page, including Japan Data Center Operator Directory & Hyperscale Fleet (Equinix, AT Tokyo, NTT, Colt, MC Digital Realty, Google, PDG, Vantage, SoftBank).

Open this site on the map View permit PDFs & MW timeline
Inzai, JapanGoogle
60 MW

operating data center · 1 linked source

  • Google
  • Inzai
  • Japan
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Japan peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
60 MWcapacity
Operatingstatus
1source page linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Japan has 46 data centers on record in Real Assets, with 887 MW reported as operating and 662 MW not yet operating. Google Inzai Data Center Campus (Chiba) is one of them.

Google has 8 data centers on record in Asia-Pacific: 4 operating and 4 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

  • google.com
    Japan Data Center Operator Directory & Hyperscale Fleet (Equinix, AT Tokyo, NTT, Colt, MC Digital Realty, Google, PDG, Vantage, SoftBank), google.com
    Web page
  • Government permit PDFs, regulatory filings & municipal zoning records (Inzai, Japan)
    Air/water permits, substation filings, tax abatements & site plans
    🔒 Permit PDFs
  • Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
    Audited facility timeline and transaction history for Google Inzai Data Center Campus (Chiba)
    🔒 MW timeline

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Google Inzai Data Center Campus (Chiba) - enter work email

Unlock the complete facility dossier for Google Inzai Data Center Campus (Chiba) (Inzai, Japan): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

Google data centers in other countries

Other data centers in Japan

Full site dossier & Asia-Pacific dataset

Unlock Google Inzai Data Center Campus (Chiba) permit PDFs, MW timeline & 563 other data centers

This page is the public summary for Google Inzai Data Center Campus (Chiba) in Inzai, Japan. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Google Inzai Data Center Campus (Chiba)
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Google in Japan

or continue in one click

Instant sign-in with a 6-digit email code or single sign-on. No password required.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Google Inzai Data Center Campus (Chiba)?

Google Inzai Data Center Campus (Chiba) is recorded under Google. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Google Inzai Data Center Campus (Chiba)?

In Inzai, Japan. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Google Inzai Data Center Campus (Chiba) have?

60 MW, as stated by APAC Operator Filings & Directory Census. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Japan Data Center Operator Directory & Hyperscale Fleet (Equinix, AT Tokyo, NTT, Colt, MC Digital Realty, Google, PDG, Vantage, SoftBank). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.