AnalystAIReal Assets Start free trial

← Asia-Pacific data centers · All sites · Japan · Tokyo

Sourced site record, every fact links to its page

Vantage Tokyo TYO1 Campus:data center in Tokyo, Japan.

Vantage Tokyo TYO1 Campus is an under construction data center in Tokyo, Japan, listed under Vantage Data Centers. Planned capacity is 268 MW according to APAC Operator Filings & Directory Census. Real Assets links 1 source page, including Japan Data Center Operator Directory & Hyperscale Fleet (Equinix, AT Tokyo, NTT, Colt, MC Digital Realty, Google, PDG, Vantage, SoftBank).

Open this site on the map View permit PDFs & MW timeline
Tokyo, JapanVantage Data Centers
268 MW

under construction data center · 1 linked source

  • Vantage Data Centers
  • Tokyo
  • Japan
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Japan peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
268 MWplanned capacity
Under constructionstatus
1source page linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Japan has 46 data centers on record in Real Assets, with 887 MW reported as operating and 662 MW not yet operating. Vantage Tokyo TYO1 Campus is one of them.

Vantage Data Centers has 5 data centers on record in Asia-Pacific: 2 operating and 3 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

  • vantage-dc.com
    Japan Data Center Operator Directory & Hyperscale Fleet (Equinix, AT Tokyo, NTT, Colt, MC Digital Realty, Google, PDG, Vantage, SoftBank), vantage-dc.com
    Web page
  • Government permit PDFs, regulatory filings & municipal zoning records (Tokyo, Japan)
    Air/water permits, substation filings, tax abatements & site plans
    🔒 Permit PDFs
  • Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
    Audited facility timeline and transaction history for Vantage Tokyo TYO1 Campus
    🔒 MW timeline

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Vantage Tokyo TYO1 Campus - enter work email

Unlock the complete facility dossier for Vantage Tokyo TYO1 Campus (Tokyo, Japan): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

Vantage Data Centers data centers in other countries

Other data centers in Japan

Full site dossier & Asia-Pacific dataset

Unlock Vantage Tokyo TYO1 Campus permit PDFs, MW timeline & 563 other data centers

This page is the public summary for Vantage Tokyo TYO1 Campus in Tokyo, Japan. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Vantage Tokyo TYO1 Campus
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Vantage Data Centers in Japan

or continue in one click

Instant sign-in with a 6-digit email code or single sign-on. No password required.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Vantage Tokyo TYO1 Campus?

Vantage Tokyo TYO1 Campus is recorded under Vantage Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Vantage Tokyo TYO1 Campus?

In Tokyo, Japan. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Vantage Tokyo TYO1 Campus have?

268 MW, as stated by APAC Operator Filings & Directory Census. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Japan Data Center Operator Directory & Hyperscale Fleet (Equinix, AT Tokyo, NTT, Colt, MC Digital Realty, Google, PDG, Vantage, SoftBank). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.