← Asia-Pacific data centers · All sites · Indonesia
Sourced site record, every fact links to its page
Biznet Technovillage Cimanggis Data Center:data center in Depok, Indonesia.
Biznet Technovillage Cimanggis Data Center is an operating data center in Depok, Indonesia, listed under Biznet. Capacity is 8 MW according to DCI Indonesia / BDx / Digital Edge / NTT / Operator Filings. Real Assets links 1 source page, including Indonesia National Data Center Operator Directory.
Open this site on the map View permit PDFs & MW timelineoperating data center · 1 linked source
- Biznet
- Depok
- Indonesia
Approximate metro position & Indonesia peer sites (exact coordinates require sign-in)
Facts on record
- OperatorBiznet
- City and countryDepok, Indonesia
- Statusoperating
- Capacity8 MW, as stated by DCI Indonesia / BDx / Digital Edge / NTT / Operator Filings
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Indonesia has 58 data centers on record in Real Assets, with 516 MW reported as operating and 2.06 GW not yet operating. Biznet Technovillage Cimanggis Data Center is one of them.
Biznet has 3 data centers on record in Asia-Pacific: 3 operating and 0 planned or under construction. See Biznet in Indonesia (3 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 14:50 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- biznetgio.com
Indonesia National Data Center Operator Directory, biznetgio.comWeb page - Government permit PDFs, regulatory filings & municipal zoning records (Depok, Indonesia)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Biznet Technovillage Cimanggis Data Center🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Biznet Technovillage Cimanggis Data Center - enter work email
Unlock the complete facility dossier for Biznet Technovillage Cimanggis Data Center (Depok, Indonesia): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More Biznet data centers in Indonesia
- Biznet Data Center Jakarta MidPlaza
Jakarta, Indonesia, operating2 MW - Biznet Bali Jimbaran Data Center
Badung, Indonesia, operating1.5 MW
Other data centers in Indonesia
- Digital Edge CGK Campus
Bekasi, Indonesia, under construction500 MW - Batam AI Factory
Batam, Indonesia, under construction360 MW - PDG JC4 Campus
Bekasi, Indonesia, under construction240 MW - BDx Indonesia CGK5 (Suryacipta Karawang)
Karawang, Indonesia, planned200 MW - JC3
Bekasi, Indonesia, under construction120 MW - Oracle Indonesia North Cloud Region (DayOne Nongsa Digital Park)
Batam, Indonesia, operating94 MW
Full site dossier & Asia-Pacific dataset
Unlock Biznet Technovillage Cimanggis Data Center permit PDFs, MW timeline & 563 other data centers
This page is the public summary for Biznet Technovillage Cimanggis Data Center in Depok, Indonesia. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Biznet Technovillage Cimanggis Data Center
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Biznet in Indonesia
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Biznet Technovillage Cimanggis Data Center?
Biznet Technovillage Cimanggis Data Center is recorded under Biznet. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Biznet Technovillage Cimanggis Data Center?
In Depok, Indonesia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Biznet Technovillage Cimanggis Data Center have?
8 MW, as stated by DCI Indonesia / BDx / Digital Edge / NTT / Operator Filings. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by Indonesia National Data Center Operator Directory. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.