← Asia-Pacific data centers · All comparisons · All operators · NEXTDC (27) · Nxtra by Airtel (22)
Head-to-head operator comparison, sourced from primary filings
NEXTDC vs Nxtra by Airtel:27 vs 22 data center sites.
As of 19 November 2026, Real Assets tracks 27 data center sites under NEXTDC (19 operating, 8 planned) vs 22 under Nxtra by Airtel (22 operating, 0 planned) in Asia-Pacific. Reported power capacity: NEXTDC has 561 MW operating, 1.0 GW planned, while Nxtra by Airtel has 23 MW operating.
Unlock all 49 NEXTDC & Nxtra by Airtel sites#3 vs #5 by sites tracked · 19 vs 22 operating
- NEXTDC: 27 sites
- Nxtra by Airtel: 22 sites
Mapped NEXTDC and Nxtra by Airtel site positions in Asia-Pacific (exact coordinates require sign-in)
NEXTDC vs Nxtra by Airtel: side-by-side summary
| # | Metric | NEXTDC | Nxtra by Airtel |
|---|---|---|---|
| 1 | Rank by sites tracked in Asia-Pacific | #3 of 212 | #5 of 212 |
| 2 | Total sites tracked | 27 (3% of market) | 22 (3% of market) |
| 3 | Operating sites | 19 | 22 |
| 4 | Planned or under construction | 8 | 0 |
| 5 | Power capacity operating | 561 MW | 23 MW |
| 6 | Power capacity planned | 1.0 GW | not reported |
| 7 | Active countries | 3 | 1 |
| 8 | Largest country | Australia (25) | India (22) |
NEXTDC & Nxtra by Airtel: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for NEXTDC and Nxtra by Airtel.
- NEXTDC Limited (ASX: NXT) 1H26 Results Presentation & Contracted Utilisation Update (Presentation · 1H FY26 · filed 24 February 2026)
Details record contracted utilisation across Sydney (S3 Gore Hill, S2 Macquarie Park, S1) and Melbourne (M2 Tullamarine, M3 West Footscray), A$2.9B liquidity backing hyperscale AI deployments, and expansion into Kuala Lumpur (KL1), Auckland (AK1), and Tokyo (TK1).Presentation ↗ - NEXTDC Limited (ASX: NXT) FY25 Annual Report & Hyperscale Development Pipeline (Annual Report · FY 2025 · filed 27 August 2025)
Reports A$427.2M net revenue (+14% YoY), A$216.7M underlying EBITDA, 173 MW of built capacity across 17 operational data centres in Sydney, Melbourne, Brisbane, Perth, and Adelaide, and a >1.5 GW planned development pipeline across S4, S5, S7, M3, M4, AK1, KL1, and TK1.Annual Report ↗ - NEXTDC Limited (ASX: NXT) 1H26 Results Presentation and Contracted Capacity Update (ASX Filing / Presentation · 1H FY26 · filed 24 February 2026)
Details record contracted megawatts across Sydney (S3 Gore Hill, S2 Macquarie Park, S1, S4/S5/S7 pipeline) and Melbourne (M2 Tullamarine, M3 West Footscray), plus expansion into Kuala Lumpur (K1, 65 MW) and Auckland (A1).ASX Filing / Presentation ↗ - NEXTDC Limited (ASX: NXT) FY25 Annual Report and Hyperscale Development Pipeline (Annual Report · FY 2025 · filed 27 August 2025)
Reports A$427.2M net revenue, A$216.7M underlying EBITDA, and 173 MW of built capacity across 17 operational data centres in Australia, alongside a 1+ GW planned development pipeline.Annual Report ↗ - NEXTDC Limited (ASX: NXT) A$1.3B Capital Raising for Sydney S3/S5 and Melbourne M3 AI Capacity (ASX Filing · 2024 · filed 11 April 2024)
Discloses an A$1.32 billion pro-rata accelerated non-renounceable entitlement offer on the ASX to accelerate built capacity at S3 Sydney and M3 Melbourne and acquire new hyperscale development sites S5 Sydney and M4 Melbourne.ASX Filing ↗ - Bharti Airtel Limited (NSE: BHARTIARTL) Integrated Annual Report: Nxtra Data Limited 12+ Hyperscale Parks (Annual Report · FY 2025 · filed 25 July 2025)
Details Bharti Airtel subsidiary Nxtra Data Limited (76% Bharti Airtel, 24% Carlyle Group) operating 12 large hyperscale data center campuses and 120+ edge facilities across Chennai, Mumbai, Pune, Bengaluru, Hyderabad, Noida, and Kolkata with INR 5,000 crore expansion to 400+ MW.Annual Report ↗ - Unlock all NEXTDC and Nxtra by Airtel filings and extracted figures →
More operator comparisons in Asia-Pacific
- Equinix vs NEXTDC (63 vs 27)
- Equinix vs Nxtra by Airtel (63 vs 22)
- ST Telemedia Global Data Centres (STT GDC) vs NEXTDC (45 vs 27)
- ST Telemedia Global Data Centres (STT GDC) vs Nxtra by Airtel (45 vs 22)
- NEXTDC vs AirTrunk (27 vs 22)
- NEXTDC vs Digital Realty (27 vs 21)
- AirTrunk vs Nxtra by Airtel (22 vs 22)
- Nxtra by Airtel vs Digital Realty (22 vs 21)
Cite or link to this benchmark
Analysts, journalists, and investor relations teams can reference this NEXTDC vs Nxtra by Airtel benchmark using the citation or HTML attribution link below.
Plain-text citation:
NEXTDC (27 sites: 19 operating, 8 planned) vs Nxtra by Airtel (22 sites: 22 operating, 0 planned) in Asia-Pacific, as of 19 November 2026. Source: Real Assets (https://realassets.analystai.ai/apac-data-centers/compare/nextdc-vs-nxtra-by-airtel)
HTML attribution link:
<a href="https://realassets.analystai.ai/apac-data-centers/compare/nextdc-vs-nxtra-by-airtel">NEXTDC vs Nxtra by Airtel: Asia-Pacific data center benchmark (Real Assets)</a>
Full market dataset & site-level records
Unlock all 49 NEXTDC and Nxtra by Airtel data center sites in Asia-Pacific
Compare every NEXTDC (27 sites) and Nxtra by Airtel (22 sites) facility on the interactive map with site-level capacity, status, and primary source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does NEXTDC have compared with Nxtra by Airtel in Asia-Pacific?
As of 19 November 2026, NEXTDC has 27 tracked sites (19 operating and 8 planned or under construction, ranked #3), compared with 22 for Nxtra by Airtel (22 operating and 0 planned or under construction, ranked #5).
Where do NEXTDC and Nxtra by Airtel overlap in Asia-Pacific?
NEXTDC and Nxtra by Airtel operate in distinct countries among the sites currently recorded in Asia-Pacific.
How does reported power capacity compare between NEXTDC and Nxtra by Airtel?
Reported power capacity: NEXTDC has 561 MW operating, 1.0 GW planned, while Nxtra by Airtel has 23 MW operating.
Where does the comparison data come from?
Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Epoch AI, Equinix, Digital Realty, Baxtel, NEXTDC.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data