← Asia-Pacific data centers · All comparisons · All operators · Equinix (59) · NEXTDC (27)
Head-to-head operator comparison, sourced from primary filings
Equinix vs NEXTDC:59 vs 27 data center sites.
As of 11 November 2026, Real Assets tracks 59 data center sites under Equinix (57 operating, 2 planned) vs 27 under NEXTDC (19 operating, 8 planned) in Asia-Pacific. Reported power capacity: Equinix has 509 MW operating, while NEXTDC has 561 MW operating, 1.0 GW planned. Both operators overlap in 2 countries, led by Australia (20 vs 25), Malaysia (2 vs 1).
Unlock all 86 Equinix & NEXTDC sites#1 vs #2 by sites tracked · 57 vs 19 operating
- Equinix: 59 sites
- NEXTDC: 27 sites
- 2 shared countries
Mapped Equinix and NEXTDC site positions in Asia-Pacific (exact coordinates require sign-in)
Equinix vs NEXTDC: side-by-side summary
| # | Metric | Equinix | NEXTDC |
|---|---|---|---|
| 1 | Rank by sites tracked in Asia-Pacific | #1 of 218 | #2 of 218 |
| 2 | Total sites tracked | 59 (9% of market) | 27 (4% of market) |
| 3 | Operating sites | 57 | 19 |
| 4 | Planned or under construction | 2 | 8 |
| 5 | Power capacity operating | 509 MW | 561 MW |
| 6 | Power capacity planned | not reported | 1.0 GW |
| 7 | Active countries | 8 | 3 |
| 8 | Largest country | Australia (20) | Australia (25) |
Equinix & NEXTDC: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Equinix and NEXTDC.
- EQUINIX INC 8-K 2026-11-09: Other Events (8.01) (8-K · filed 9 November 2026)
On November 9, 2026, Equinix Europe 2 Financing Corporation LLC issued multiple series of Senior Notes guaranteed by Equinix, Inc. The aggregate principal amounts include €650,000,000 of 4.150% Senior Notes due 2028, €700,000,000 of 4.800% Senior Notes due 2033, €500,000,000 of 5.100% Senior Notes due 2035, and €650,000,000 of 5.450% Senior Notes due 2038. E8-K ↗ - Equinix Form 8-K, filed 2026-10-28 (8-K · filed 28 October 2026)
Equinix, Inc. reported its third-quarter 2026 results, delivering record annualized gross bookings of $533 million and raising its full-year guidance for the third consecutive quarter. Revenues for the quarter reached $2.571 billion, while net income attributable to common stockholders came in at $489 million, or $4.93 per share. For the full year of 2026, t8-K ↗ - Equinix Form 10-Q (2026-10-28) (10-Q · filed 30 September 2026)
Equinix (Equinix Form 10-Q (2026-10-28)) reported in its financial statements: Gross Revenue: $ 2,571 USD (millions) (Q3 2026), Ebitda: $600 USD (millions) (Q3 2026), Net Income: $489 USD (millions) (Q3 2026).10-Q ↗ - Equinix Form 8-K, Item 2.02: second quarter 2026 results (8-K / Earnings Release · Q2 2026 · filed 29 July 2026)
Equinix Q2 2026 Form 8-K (Item 2.02): Reports Q2 2026 revenue of $2.625 billion (up 16%), adjusted EBITDA of $1.396 billion (53% margin), AFFO of $1.168 billion, $424 million of annualized gross bookings, 9,700 net interconnections added, 52 major projects underway across 33 markets, and FY 2026 guided capital expenditures of $5.000 to $6.000 billion.8-K / Earnings Release ↗ - Equinix Form 10-Q (2026-07-29) (10-Q · filed 30 June 2026)
Equinix (Equinix Form 10-Q (2026-07-29)) reported in its financial statements: Gross Revenue: $ 2,625 USD (millions) (Q2 2026), Ebitda: $665 USD (millions) (Q2 2026), Net Income: $477 USD (millions) (Q2 2026).10-Q ↗ - Equinix Form 10-Q for quarter ended 2026-03-31 (10-Q · 2026-03-31 · filed 29 April 2026)
Equinix Q1 2026 Form 10-Q: Reports 281 data centers across 77 markets globally (including 23 xScale hyperscale data centers), Q1 2026 revenue of $2.444 billion, adjusted EBITDA of $1.245 billion, AFFO of $1.065 billion, $1.256 billion in Q1 capital expenditures ($705 million Americas, $329 million EMEA, $222 million Asia-Pacific), and $22.08 billion in total debt principal outstanding.10-Q ↗ - NEXTDC Limited (ASX: NXT) 1H26 Results Presentation & Contracted Utilisation Update (Presentation · 1H FY26 · filed 24 February 2026)
Details record contracted utilisation across Sydney (S3 Gore Hill, S2 Macquarie Park, S1) and Melbourne (M2 Tullamarine, M3 West Footscray), A$2.9B liquidity backing hyperscale AI deployments, and expansion into Kuala Lumpur (KL1), Auckland (AK1), and Tokyo (TK1).Presentation ↗ - NEXTDC Limited (ASX: NXT) FY25 Annual Report & Hyperscale Development Pipeline (Annual Report · FY 2025 · filed 27 August 2025)
Reports A$427.2M net revenue (+14% YoY), A$216.7M underlying EBITDA, 173 MW of built capacity across 17 operational data centres in Sydney, Melbourne, Brisbane, Perth, and Adelaide, and a >1.5 GW planned development pipeline across S4, S5, S7, M3, M4, AK1, KL1, and TK1.Annual Report ↗ - Unlock all Equinix and NEXTDC filings and extracted figures →
More operator comparisons in Asia-Pacific
- Equinix vs ST Telemedia Global Data Centres (STT GDC) (59 vs 23)
- Equinix vs NTT Global Data Centers (59 vs 21)
- Equinix vs AirTrunk (59 vs 18)
- Equinix vs Digital Realty (59 vs 16)
- NEXTDC vs ST Telemedia Global Data Centres (STT GDC) (27 vs 23)
- NEXTDC vs NTT Global Data Centers (27 vs 21)
- NEXTDC vs AirTrunk (27 vs 18)
- NEXTDC vs Digital Realty (27 vs 16)
Cite or link to this benchmark
Analysts, journalists, and investor relations teams can reference this Equinix vs NEXTDC benchmark using the citation or HTML attribution link below.
Plain-text citation:
Equinix (59 sites: 57 operating, 2 planned) vs NEXTDC (27 sites: 19 operating, 8 planned) in Asia-Pacific, as of 11 November 2026. Source: Real Assets (https://realassets.analystai.ai/apac-data-centers/compare/equinix-vs-nextdc)
HTML attribution link:
<a href="https://realassets.analystai.ai/apac-data-centers/compare/equinix-vs-nextdc">Equinix vs NEXTDC: Asia-Pacific data center benchmark (Real Assets)</a>
Full market dataset & site-level records
Unlock all 86 Equinix and NEXTDC data center sites in Asia-Pacific
Compare every Equinix (59 sites) and NEXTDC (27 sites) facility on the interactive map with site-level capacity, status, and primary source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Equinix have compared with NEXTDC in Asia-Pacific?
As of 11 November 2026, Equinix has 59 tracked sites (57 operating and 2 planned or under construction, ranked #1), compared with 27 for NEXTDC (19 operating and 8 planned or under construction, ranked #2).
Where do Equinix and NEXTDC overlap in Asia-Pacific?
Equinix and NEXTDC both have tracked sites in 2 countries: Australia (20 vs 25), Malaysia (2 vs 1).
How does reported power capacity compare between Equinix and NEXTDC?
Reported power capacity: Equinix has 509 MW operating, while NEXTDC has 561 MW operating, 1.0 GW planned.
Where does the comparison data come from?
Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Epoch AI, Baxtel, Equinix, NEXTDC, Digital Realty.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data