← Vietnam ready-built factories and warehouses · All sites
Sourced site record, every fact links to its page
Quan Ngang Giai Doan 3 Industrial Zone:ready-built factory and warehouse in Quang Tri, Quang Tri.
Quan Ngang Giai Doan 3 Industrial Zone is a planned ready-built factory and warehouse in Quang Tri, Quang Tri, listed under Công ty Cổ phần Licogi 13. Reported floor area is 1,160,000 sqm (about 12,486,240 sq ft). Real Assets links 2 source pages, including congthuong.vn, vietnam_industrial_park_curated.
Open this site on the map Start a 7-day trialplanned ready-built factory and warehouse · 2 linked sources
- Công ty Cổ phần Licogi 13
- Quang Tri
- Quang Tri
Approximate metro position & Quang Tri peer sites (exact coordinates require sign-in)
Facts on record
- OperatorCông ty Cổ phần Licogi 13
- City and provinceQuang Tri, Quang Tri
- Statusplanned
- Planned floor area1,160,000 square metres (about 12,486,240 square feet)
- Expected completion2029
- Sources linked2 from 2 publishers
- Record updated30 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 5 ready-built factories and warehouses in Quang Tri that have a page.
Công ty Cổ phần Licogi 13 has 1 ready-built factory and warehouse in Vietnam with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 31 October 2026 at 05:38 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Quảng Trị: Mở rộng Khu công nghiệp Quán Ngang giai đoạn 3
congthuong.vnWeb page - quangtri.gov.vn
vietnam_industrial_park_curated, quangtri.gov.vnWeb page
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Other ready-built factories and warehouses in Quang Tri
- Quang Tri Industrial Zone
Quang Tri, Quang Tri, under construction4,810,000 sqm - Cam Lien Industrial Zone
Quang Binh, Quang Tri, under construction4,500,000 sqm - Capella Quang Tri Industrial Zone
Quang Tri, Quang Tri, planned2,204,700 sqm - Amber Tay Bac Ho Xa Industrial Zone
Quang Tri, Quang Tri, under construction2,147,700 sqm
Full market dataset & site-level records
Open Quan Ngang Giai Doan 3 Industrial Zone and 769 other ready-built factories and warehouses
This page is the public summary. Start a 7-day trial or sign in to see Quan Ngang Giai Doan 3 Industrial Zone on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Quan Ngang Giai Doan 3 Industrial Zone?
Quan Ngang Giai Doan 3 Industrial Zone is recorded under Công ty Cổ phần Licogi 13. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Quan Ngang Giai Doan 3 Industrial Zone?
In Quang Tri, Quang Tri. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How large is Quan Ngang Giai Doan 3 Industrial Zone?
1,160,000 square metres (about 12,486,240 square feet). The site is not operating yet, so this is a stated plan.
Where does this information come from?
From 2 linked pages by congthuong.vn, vietnam_industrial_park_curated. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.