← United States data centers · All sites · Texas
Sourced site record, every fact links to its page
Tract Austin:data center in Uhland, Texas.
Tract Austin is a planned data center in Uhland, Texas, listed under Tract. Planned capacity is 2 GW according to DataCenterDynamics. Real Assets links 3 source pages, including DataCenterDynamics, Data Center Dynamics.
Open this site on the map View the full site recordplanned data center · 3 linked sources
- Tract
- Uhland
- Texas
Approximate position and Texas peer sites (the exact position needs sign-in)
Facts on record
- OperatorTract
- City and stateUhland, Texas
- Statusplanned
- Planned capacity2 GW, as stated by DataCenterDynamics
- Expected completionNot recorded
- Sources linked3 from 2 publishers
- Record updated21 November 2026
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 7 figures
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Texas has 245 data centers on record in Real Assets, with 5.19 GW reported as operating and 75.92 GW not yet operating. Tract Austin is one of them.
Tract has 13 data centers on record in the United States: 0 operating and 13 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Tract acquires 1,515 acres outside Austin, Texas, for 2GW data center park
DataCenterDynamics, datacenterdynamics.com, published 18 September 2026Web page - Tract looks to develop 2,000-acre data center park outside Austin, Texas
Data Center Dynamics, datacenterdynamics.com, published 18 September 2026Web page - 1 additional source filing & extracted fact citations for Tract Austin
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
Tract data centers in other states
- Hanover Technology Park
Ashland, Virginia, planned2.4 GW - Tract Phoenix
Maricopa, Arizona, planned1.8 GW - South Valley Technology Park
Sparks, Nevada, planned1.2 GW - Tract Des Moines
Altoona, Iowa, planned1 GW - Tract Illinois (Morris)
Morris, Illinois, planned1 GW - Tuckahoe Technology Park
Goochland County, Virginia, planned900 MW
Other data centers in Texas
- Project Matador
Panhandle, Texas, under construction17 GW - GridFree AI South Dallas One
Dallas, Texas, planned5 GW - Sailfish Comanche Circle
Tolar, Texas, planned5 GW - Prometheus Pecos Project
Pecos, Texas, planned2.5 GW - Amp Energy East Texas
Lufkin, Texas, planned2.1 GW - IREN Sweetwater Mega-Hub (Sweetwater 1 & 2)
Sweetwater, Texas, under construction2 GW
Full site dossier & United States dataset
Open Tract Austin and 1,276 other data centers
This page is the public summary for Tract Austin in Uhland, Texas. Sign in to see its full record: 3 source pages and 7 sourced figures.
- Tract Austin on the interactive map, with the sites around it
- All 3 linked source pages
- 7 sourced figures, each with its page and quote
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Tract Austin?
Tract Austin is recorded under Tract. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Tract Austin?
In Uhland, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Tract Austin have?
2 GW, as stated by DataCenterDynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 3 linked pages by DataCenterDynamics, Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.