T5 Data Centers - T5@Grayslake Campus:data center in Grayslake, Illinois.

T5 Data Centers - T5@Grayslake Campus is a planned data center in Grayslake, Illinois, listed under T5. Planned capacity is 480 MW according to Data Center Dynamics. Real Assets links 3 source pages, including Data Center Dynamics, Capacity, GovTech (Tribune News Service / Lake County News-Sun).

Open this site on the map Start a 7-day trial
480 MWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorT5
  • City and stateGrayslake, Illinois
  • Statusplanned
  • Planned capacity480 MW, as stated by Data Center Dynamics
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Illinois has 36 data centers on record in Real Assets, with 435 MW reported as operating and 8.77 GW not yet operating. T5 Data Centers - T5@Grayslake Campus is one of them.

T5 has 2 data centers in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

T5 data centers in other states

Other data centers in Illinois

Full market dataset & site-level records

Open T5 Data Centers - T5@Grayslake Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see T5 Data Centers - T5@Grayslake Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates T5 Data Centers - T5@Grayslake Campus?

T5 Data Centers - T5@Grayslake Campus is recorded under T5. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is T5 Data Centers - T5@Grayslake Campus?

In Grayslake, Illinois. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does T5 Data Centers - T5@Grayslake Campus have?

480 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Data Center Dynamics, Capacity, GovTech (Tribune News Service / Lake County News-Sun). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.