AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

Sparkfund data center campus - Capacity Connect program, Minnesota:data center in Capacity Connect program, Minnesota.

Sparkfund data center campus - Capacity Connect program, Minnesota is a planned data center in Capacity Connect program, Minnesota, listed under Sparkfund. Planned capacity is 200 MW according to Latitude Media. Real Assets links 1 source page, including Latitude Media.

Open this site on the map View permit PDFs & MW timeline
Capacity Connect program, MinnesotaSparkfund
200 MW

planned data center · 1 linked source

  • Sparkfund
  • Capacity Connect program
  • Minnesota
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Minnesota peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
200 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorSparkfund
  • City and stateCapacity Connect program, Minnesota
  • Statusplanned
  • Planned capacity200 MW, as stated by Latitude Media
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated11 November 2026
  • Exact parcel coordinates & street address🔒 View on parcel map
  • Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
  • Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 18 data centers in Minnesota that have a page.

Sparkfund has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Sparkfund data center campus - Capacity Connect program, Minnesota - enter work email

Unlock the complete facility dossier for Sparkfund data center campus - Capacity Connect program, Minnesota (Capacity Connect program, Minnesota): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

Other data centers in Minnesota

Full site dossier & United States dataset

Unlock Sparkfund data center campus - Capacity Connect program, Minnesota permit PDFs, MW timeline & 1,304 other data centers

This page is the public summary for Sparkfund data center campus - Capacity Connect program, Minnesota in Capacity Connect program, Minnesota. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Sparkfund data center campus - Capacity Connect program, Minnesota
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Sparkfund in Minnesota

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Sparkfund data center campus - Capacity Connect program, Minnesota?

Sparkfund data center campus - Capacity Connect program, Minnesota is recorded under Sparkfund. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Sparkfund data center campus - Capacity Connect program, Minnesota?

In Capacity Connect program, Minnesota. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Sparkfund data center campus - Capacity Connect program, Minnesota have?

200 MW, as stated by Latitude Media. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Latitude Media. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.