Project Lola:data center in Council Bluffs, Iowa.
Project Lola is an under construction data center in Council Bluffs, Iowa, listed under Edged Energy. Planned capacity is 200 MW according to Data Center Dynamics. Real Assets links 2 source pages, including Data Center Dynamics.
Open this site on the map View permit PDFs & MW timelineunder construction data center · 2 linked sources
- Edged Energy
- Council Bluffs
- Iowa
Approximate metro position & Iowa peer sites (exact coordinates require sign-in)
Facts on record
- OperatorEdged Energy
- City and stateCouncil Bluffs, Iowa
- Statusunder construction
- Planned capacity200 MW, as stated by Data Center Dynamics
- Expected completionNot recorded
- Sources linked2 from 1 publisher
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 21 data centers in Iowa that have a page.
Edged Energy has 1 data center in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Edged reduces scope of planned data center campus in Council Bluffs, Iowa - DCD
Data Center Dynamics, datacenterdynamics.com, published 18 September 2026Web page - Edged tops out data center in Council Bluffs, Iowa
Data Center Dynamics, datacenterdynamics.com, published 26 June 2026Web page - Government permit PDFs, regulatory filings & municipal zoning records (Council Bluffs, Iowa)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Project Lola🔒 MW timeline
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Project Lola - enter work email
Unlock the complete facility dossier for Project Lola (Council Bluffs, Iowa): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
Other data centers in Iowa
- QTS Cedar Rapids
Cedar Rapids, Iowa, planned1.59 GW - COPT Van Meter Campus
Van Meter, Iowa, planned1 GW - Microsoft West Des Moines Cloud Cluster (Ginger & Osmium)
West Des Moines, Iowa, operating1 GW - Tract Des Moines
Altoona, Iowa, planned1 GW - QTS: Big Cedar Industrial Center
Cedar Rapids, Iowa, under construction616 MW - Google Cedar Rapids Data Center
Cedar Rapids, Iowa, planned600 MW
Full site dossier & United States dataset
Unlock Project Lola permit PDFs, MW timeline & 1,304 other data centers
This page is the public summary for Project Lola in Council Bluffs, Iowa. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Project Lola
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Edged Energy in Iowa
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Project Lola?
Project Lola is recorded under Edged Energy. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Project Lola?
In Council Bluffs, Iowa. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Project Lola have?
200 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.