Project Lola:data center in Council Bluffs, Iowa.

Project Lola is an under construction data center in Council Bluffs, Iowa, listed under Edged Energy. Planned capacity is 200 MW according to Data Center Dynamics. Real Assets links 2 source pages, including Data Center Dynamics.

Open this site on the map View permit PDFs & MW timeline
Council Bluffs, IowaEdged Energy
200 MW

under construction data center · 2 linked sources

  • Edged Energy
  • Council Bluffs
  • Iowa
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Iowa peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
200 MWplanned capacity
Under constructionstatus
2source pages linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 21 data centers in Iowa that have a page.

Edged Energy has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

2 sources on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Project Lola - enter work email

Unlock the complete facility dossier for Project Lola (Council Bluffs, Iowa): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

Other data centers in Iowa

Full site dossier & United States dataset

Unlock Project Lola permit PDFs, MW timeline & 1,304 other data centers

This page is the public summary for Project Lola in Council Bluffs, Iowa. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Project Lola
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Edged Energy in Iowa

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Project Lola?

Project Lola is recorded under Edged Energy. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Project Lola?

In Council Bluffs, Iowa. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Project Lola have?

200 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.