← United States data centers · All sites
Sourced site record, every fact links to its page
Muskie Data Campus:data center in eastern Kentucky, Kentucky.
Muskie Data Campus is a planned data center in eastern Kentucky, Kentucky, listed under TeraWulf. Planned capacity is 1 GW according to TeraWulf (SEC 8-K). Real Assets links 3 source pages, including TeraWulf Inc., TeraWulf (SEC 8-K).
Open this site on the map View the full site recordplanned data center · 3 linked sources
- TeraWulf
- eastern Kentucky
- Kentucky
Approximate position and Kentucky peer sites (the exact position needs sign-in)
Facts on record
- OperatorTeraWulf
- City and stateeastern Kentucky, Kentucky
- Statusplanned
- Planned capacity1 GW, as stated by TeraWulf (SEC 8-K)
- Expected completionNot recorded
- Sources linked3 from 2 publishers
- Record updated22 November 2026
- Exact location on the map🔒 View on the map
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 10 data centers in Kentucky that have a page.
TeraWulf has 8 data centers on record in the United States: 4 operating and 4 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- TeraWulf Reports Third Quarter 2026 Results :: TeraWulf Inc. (WULF)
TeraWulf Inc., investors.terawulf.com, published 6 November 2026Web page - TERAWULF INC. 8-K 2026-11-04: Material Definitive Agreement (1.01); Regulation FD Disclosure (7.01); Other Events (8.01)
TeraWulf (SEC 8-K), sec.gov, published 4 November 2026Web page - 1 additional source filing & extracted fact citations for Muskie Data Campus
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
More TeraWulf data centers in Kentucky
- Justified Data Campus
Hawesville, Kentucky, planned480 MW
TeraWulf data centers in other states
- Lake Mariner - CB-3, CB-4 & CB-5
Barker, New York, operating360 MW - Cayuga
Lansing, New York, planned320 MW - Chesapeake Data Campus
Morgantown, Maryland, operating210 MW - TeraWulf Abernathy Data Center
Abernathy, Texas, planned168 MW
Other data centers in Kentucky
- Paducah American Energy Hub
West Paducah, Kentucky, planned1.8 GW - PowerHouse Louisville
Jefferson, Kentucky, planned402 MW - Core Scientific Calvert 1, 2, & 3
Calvert, Kentucky, operatingNot recorded - Flexential East Louisville
Louisville, Kentucky, operatingNot recorded - Flexential Louisville 2, 3, 4
Louisville, Kentucky, operatingNot recorded - Florence, KY, CIN6
Florence, Kentucky, operatingNot recorded
Full site dossier & United States dataset
Open Muskie Data Campus and 1,276 other data centers
This page is the public summary for Muskie Data Campus in eastern Kentucky, Kentucky. Sign in to see its full record: 3 source pages.
- Muskie Data Campus on the interactive map, with the sites around it
- All 3 linked source pages
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Muskie Data Campus?
Muskie Data Campus is recorded under TeraWulf. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Muskie Data Campus?
In eastern Kentucky, Kentucky. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Muskie Data Campus have?
1 GW, as stated by TeraWulf (SEC 8-K). The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 3 linked pages by TeraWulf Inc., TeraWulf (SEC 8-K). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.