AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

Monarch Compute Campus:data center in Point Pleasant, West Virginia.

Monarch Compute Campus is a planned data center in Point Pleasant, West Virginia, listed under Nscale. Planned capacity is 8 GW according to American Intelligence & Power Corporation (PR Newswire release, Bolsamania copy). Real Assets links 3 source pages, including WCHS (Sinclair), American Intelligence & Power Corporation (PR Newswire release, Bolsamania copy).

Open this site on the map Start a 7-day trial
8 GWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorNscale
  • City and statePoint Pleasant, West Virginia
  • Statusplanned
  • Planned capacity8 GW, as stated by American Intelligence & Power Corporation (PR Newswire release, Bolsamania copy)
  • Expected completionNot recorded
  • Sources linked3 from 2 publishers
  • Record updated27 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 1 data center in West Virginia that has a page.

Nscale has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 30 October 2026 at 08:14 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

3 sources on record; the 2 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

Full market dataset & site-level records

Open Monarch Compute Campus and 23 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Monarch Compute Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Monarch Compute Campus?

Monarch Compute Campus is recorded under Nscale. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Monarch Compute Campus?

In Point Pleasant, West Virginia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Monarch Compute Campus have?

8 GW, as stated by American Intelligence & Power Corporation (PR Newswire release, Bolsamania copy). The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by WCHS (Sinclair), American Intelligence & Power Corporation (PR Newswire release, Bolsamania copy). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.