← United States data centers · All sites · Washington
Sourced site record, every fact links to its page
Intergate Columbia:data center in East Wenatchee, Washington.
Intergate Columbia is a planned data center in East Wenatchee, Washington, listed under Sabey Data Centers. Planned capacity is 360 MW. Real Assets links 1 source page, including Sabey Data Centers.
Open this site on the map Start a 7-day trialplanned data center · 1 linked source
- Sabey Data Centers
- East Wenatchee
- Washington
Approximate metro position & Washington peer sites (exact coordinates require sign-in)
Facts on record
- OperatorSabey Data Centers
- City and stateEast Wenatchee, Washington
- Statusplanned
- Planned capacity360 MW
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated30 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Washington has 14 data centers on record in Real Assets, with 174 MW reported as operating and 680 MW not yet operating. Intergate Columbia is one of them.
Sabey Data Centers has 10 data centers on record in the United States: 9 operating and 1 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 30 October 2026 at 12:11 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Sabey Data Centers - Intergate.Columbia Data Center Campus (East Wenatchee, Washington)
Sabey Data Centers, sabeydatacenters.com, published 1 June 2025Web page
1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.
More Sabey Data Centers data centers in Washington
- Sabey Intergate Quincy
Quincy, Washington, operating85 MW - SDC Columbia
East Wenatchee, Washington, operatingNot recorded - SDC Quincy
Quincy, Washington, operatingNot recorded - SDC Seattle
Seattle, Washington, operatingNot recorded
Sabey Data Centers data centers in other states
- Sabey Indianapolis Data Center
Marion, Indiana, planned250 MW - SDC Austin
Austin, Texas, operating84 MW - Sabey Intergate.Austin Campus
Round Rock, Texas, operatingNot recorded - SDC Ashburn
Ashburn, Virginia, operatingNot recorded - SDC Manhattan
New York, New York, operatingNot recorded - SDC Umatilla
Umatilla, Oregon, operatingNot recorded
Other data centers in Washington
- Amazon AWS - Walla Walla
Burbank, Washington, planned320 MW - Vantage Quincy, Washington
Quincy, Washington, operating89 MW - Blue Fern Development's Data Center
Seattle, Washington, plannedNot recorded - Cle Elum, WA
Cle Elum, Washington, plannedNot recorded - Equinix Seattle
Seattle, Washington, operatingNot recorded - Microsoft Quincy Columbia Basin Campus
Quincy, Washington, operatingNot recorded
Full market dataset & site-level records
Open Intergate Columbia and 828 other data centers
This page is the public summary. Start a 7-day trial or sign in to see Intergate Columbia on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Questions
Who operates Intergate Columbia?
Intergate Columbia is recorded under Sabey Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Intergate Columbia?
In East Wenatchee, Washington. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Intergate Columbia have?
360 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by Sabey Data Centers. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.