Digihost: AL Site: Phase 1 and 2:data center in Shelby, Alabama.

Digihost: AL Site: Phase 1 and 2 is a planned data center in Shelby, Alabama, listed under Digihost. Planned capacity is 55 MW according to Digihost Technology Inc. (GlobeNewswire, via Nasdaq). Real Assets links 3 source pages, including Data Center Dynamics, Digihost Technology Inc. (GlobeNewswire, via Nasdaq), Digi Power X Inc. (company Q2 2026 results release, via Finviz).

Open this site on the map Start a 7-day trial
55 MWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorDigihost
  • City and stateShelby, Alabama
  • Statusplanned
  • Planned capacity55 MW, as stated by Digihost Technology Inc. (GlobeNewswire, via Nasdaq)
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 10 data centers in Alabama that have a page.

Digihost has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Alabama

Full market dataset & site-level records

Open Digihost: AL Site: Phase 1 and 2 and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Digihost: AL Site: Phase 1 and 2 on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Digihost: AL Site: Phase 1 and 2?

Digihost: AL Site: Phase 1 and 2 is recorded under Digihost. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Digihost: AL Site: Phase 1 and 2?

In Shelby, Alabama. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Digihost: AL Site: Phase 1 and 2 have?

55 MW, as stated by Digihost Technology Inc. (GlobeNewswire, via Nasdaq). The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Data Center Dynamics, Digihost Technology Inc. (GlobeNewswire, via Nasdaq), Digi Power X Inc. (company Q2 2026 results release, via Finviz). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.