DFW12 (Red Oak Campus):data center in Red Oak, Texas.

DFW12 (Red Oak Campus) is a planned data center in Red Oak, Texas, listed under DataBank. Planned capacity is 60 MW according to DataBank. Real Assets links 2 source pages, including DataBank, Data Center Dynamics.

Open this site on the map View the full site record
Red Oak, TexasDataBank
60 MW

planned data center · 2 linked sources

  • DataBank
  • Red Oak
  • Texas
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Texas peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
60 MWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorDataBank
  • City and stateRed Oak, Texas
  • Statusplanned
  • Planned capacity60 MW, as stated by DataBank
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated21 November 2026
  • Exact location on the map🔒 View on the map
  • Sourced figures, each with its page and quote🔒 4 figures

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Texas has 245 data centers on record in Real Assets, with 5.19 GW reported as operating and 75.92 GW not yet operating. DFW12 (Red Oak Campus) is one of them.

DataBank has 90 data centers on record in the United States: 72 operating and 18 planned or under construction. See DataBank in Texas (24 sites). Compare Digital Realty vs DataBank.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 13:45 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

2 sources on record. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open DFW12 (Red Oak Campus)'s record: 2 source pages and 4 sourced figures - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

More DataBank data centers in Texas

DataBank data centers in other states

Other data centers in Texas

Full site dossier & United States dataset

Open DFW12 (Red Oak Campus) and 1,276 other data centers

This page is the public summary for DFW12 (Red Oak Campus) in Red Oak, Texas. Sign in to see its full record: 2 source pages and 4 sourced figures.

  • DFW12 (Red Oak Campus) on the interactive map, with the sites around it
  • All 2 linked source pages
  • 4 sourced figures, each with its page and quote

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates DFW12 (Red Oak Campus)?

DFW12 (Red Oak Campus) is recorded under DataBank. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is DFW12 (Red Oak Campus)?

In Red Oak, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does DFW12 (Red Oak Campus) have?

60 MW, as stated by DataBank. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by DataBank, Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.