← United States data centers · All sites · California · San Diego
Sourced site record, every fact links to its page
DataBank San Diego Kearney Mesa:data center in San Diego, California.
DataBank San Diego Kearney Mesa is an operating data center in San Diego, California, listed under DataBank. Capacity is not recorded. Real Assets links 1 source page, including Baxtel.
Open this site on the map View permit PDFs & MW timelineoperating data center · 1 linked source
- DataBank
- San Diego
- California
Approximate metro position & California peer sites (exact coordinates require sign-in)
Facts on record
- OperatorDataBank
- City and stateSan Diego, California
- Statusoperating
- CapacityNot recorded
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
California has 93 data centers on record in Real Assets, with 318 MW reported as operating and 2.48 GW not yet operating. DataBank San Diego Kearney Mesa is one of them.
DataBank has 91 data centers on record in the United States: 72 operating and 19 planned or under construction. See DataBank in California (8 sites). Compare Digital Realty vs DataBank.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- DataBank San Diego Kearney Mesa Data Center
Baxtel, baxtel.comWeb page - Government permit PDFs, regulatory filings & municipal zoning records (San Diego, California)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for DataBank San Diego Kearney Mesa🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for DataBank San Diego Kearney Mesa - enter work email
Unlock the complete facility dossier for DataBank San Diego Kearney Mesa (San Diego, California): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More DataBank data centers in California
- DataBank (Los Angeles - LAX2)
Vernon, California, under construction32 MW - DataBank (San Diego / SAN1)
San Diego, California, operating7.5 MW - DataBank LAX1
Los Angeles, California, operating2 MW - DataBank ANGELES Los Angeles
Los Angeles, California, plannedNot recorded - DataBank Santa Clara SFO1
San Francisco Bay Area, California, operatingNot recorded - DataBank SNA1 17222 Von Karman
Los Angeles, California, operatingNot recorded
DataBank data centers in other states
- GigaPop Red Oak
Dallas, Texas, planned540 MW - Databank (Red Oak)
Red Oak, Texas, under construction480 MW - Project Indo
Cartersville, Georgia, planned288 MW - Databank IAD5 - Culpeper
Culpeper, Virginia, under construction192 MW - DataBank ATL5 / ATL6 (Lithia Springs)
Atlanta, Georgia, under construction120 MW - DataBank IAD6 - Culpeper
Culpeper, Virginia, under construction120 MW
Other data centers in California
- Coachella Valley Technology Campus
Coachella, California, planned600 MW - CalEthos Campus Site 1
Calipatria, California, planned500 MW - Prologis San Jose Campus
San Jose, California, planned396 MW - Imperial Valley AI Data Center
Imperial, California, planned330 MW - Silicon Valley SJC35
Santa Clara, California, operating120 MW - Ameresco NAS Lemoore Data Center
Kings, California, planned100 MW
Full site dossier & United States dataset
Unlock DataBank San Diego Kearney Mesa permit PDFs, MW timeline & 1,304 other data centers
This page is the public summary for DataBank San Diego Kearney Mesa in San Diego, California. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for DataBank San Diego Kearney Mesa
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for DataBank in California
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates DataBank San Diego Kearney Mesa?
DataBank San Diego Kearney Mesa is recorded under DataBank. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is DataBank San Diego Kearney Mesa?
In San Diego, California. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does DataBank San Diego Kearney Mesa have?
No capacity figure is recorded for this site. Real Assets does not estimate one.
Where does this information come from?
From 1 linked page by Baxtel. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.