← United States data centers · All sites · California · Santa Clara
Sourced site record, every fact links to its page
CoreSite SV3:data center in Santa Clara, California.
CoreSite SV3 is an operating data center in Santa Clara, California, listed under CoreSite. Capacity is not recorded. Real Assets links 1 source page, including Baxtel.
Open this site on the map View permit PDFs & MW timelineoperating data center · 1 linked source
- CoreSite
- Santa Clara
- California
Approximate metro position & California peer sites (exact coordinates require sign-in)
Facts on record
- OperatorCoreSite
- City and stateSanta Clara, California
- Statusoperating
- CapacityNot recorded
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
California has 93 data centers on record in Real Assets, with 318 MW reported as operating and 2.48 GW not yet operating. CoreSite SV3 is one of them.
CoreSite has 30 data centers on record in the United States: 30 operating and 0 planned or under construction. See CoreSite in California (12 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- CoreSite SV3 Data Center
Baxtel, baxtel.comWeb page - Government permit PDFs, regulatory filings & municipal zoning records (Santa Clara, California)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for CoreSite SV3🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for CoreSite SV3 - enter work email
Unlock the complete facility dossier for CoreSite SV3 (Santa Clara, California): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More CoreSite data centers in California
- CoreSite LA1
Los Angeles, California, operatingNot recorded - CoreSite LA2
Los Angeles, California, operatingNot recorded - CoreSite LA3
Los Angeles, California, operatingNot recorded - CoreSite SV1
San Jose, California, operatingNot recorded - CoreSite SV2
Milpitas, California, operatingNot recorded - CoreSite SV4
Santa Clara, California, operatingNot recorded
CoreSite data centers in other states
- CoreSite AT1
Atlanta, Georgia, operatingNot recorded - CoreSite AT2
Marietta, Georgia, operatingNot recorded - CoreSite BO1
Somerville, Massachusetts, operatingNot recorded - CoreSite CH1
Chicago, Illinois, operatingNot recorded - CoreSite CH2
Chicago, Illinois, operatingNot recorded - CoreSite DC1
Washington, D.C., District of Columbia, operatingNot recorded
Other data centers in California
- Coachella Valley Technology Campus
Coachella, California, planned600 MW - CalEthos Campus Site 1
Calipatria, California, planned500 MW - Prologis San Jose Campus
San Jose, California, planned396 MW - Imperial Valley AI Data Center
Imperial, California, planned330 MW - Silicon Valley SJC35
Santa Clara, California, operating120 MW - Ameresco NAS Lemoore Data Center
Kings, California, planned100 MW
Full site dossier & United States dataset
Unlock CoreSite SV3 permit PDFs, MW timeline & 1,304 other data centers
This page is the public summary for CoreSite SV3 in Santa Clara, California. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for CoreSite SV3
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for CoreSite in California
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates CoreSite SV3?
CoreSite SV3 is recorded under CoreSite. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is CoreSite SV3?
In Santa Clara, California. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does CoreSite SV3 have?
No capacity figure is recorded for this site. Real Assets does not estimate one.
Where does this information come from?
From 1 linked page by Baxtel. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.