AnalystAIReal Assets Start the 3-day preview

← United States data centers · All sites

Sourced site record, every fact links to its page

Archer: Minneapolis Campus:data center in Faribault, Minnesota.

Archer: Minneapolis Campus is a planned data center in Faribault, Minnesota, listed under Archer Datacenters. Planned capacity is 120 MW according to Data Center Dynamics. Real Assets links 2 source pages, including Data Center Dynamics, Great River Energy (reprint of Finance & Commerce).

Open this site on the map View the full site record
Faribault, MinnesotaArcher Datacenters
120 MW

planned data center · 2 linked sources

  • Archer Datacenters
  • Faribault
  • Minnesota
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Minnesota peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
120 MWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorArcher Datacenters
  • City and stateFaribault, Minnesota
  • Statusplanned
  • Planned capacity120 MW, as stated by Data Center Dynamics
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated21 November 2026
  • Exact location on the map🔒 View on the map
  • Sourced figures, each with its page and quote🔒 8 figures

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 17 data centers in Minnesota that have a page.

Archer Datacenters has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

2 sources on record. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open Archer: Minneapolis Campus's record: 2 source pages and 8 sourced figures - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

Other data centers in Minnesota

Full site dossier & United States dataset

Open Archer: Minneapolis Campus and 1,276 other data centers

This page is the public summary for Archer: Minneapolis Campus in Faribault, Minnesota. Sign in to see its full record: 2 source pages and 8 sourced figures.

  • Archer: Minneapolis Campus on the interactive map, with the sites around it
  • All 2 linked source pages
  • 8 sourced figures, each with its page and quote

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Archer: Minneapolis Campus?

Archer: Minneapolis Campus is recorded under Archer Datacenters. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Archer: Minneapolis Campus?

In Faribault, Minnesota. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Archer: Minneapolis Campus have?

120 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by Data Center Dynamics, Great River Energy (reprint of Finance & Commerce). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.