AnalystAIReal Assets Start free trial

← United States data centers · All sites · Indiana

Sourced site record, every fact links to its page

10 MW AI data center project:data center in Indiana, Indiana.

10 MW AI data center project is a planned data center in Indiana, Indiana, listed under BrightRay. Planned capacity is 10 MW. Real Assets links 1 source page, including w.media.

Open this site on the map Start a 7-day trial
10 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorBrightRay
  • City and stateIndiana, Indiana
  • Statusplanned
  • Planned capacity10 MW
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated29 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Indiana has 21 data centers on record in Real Assets, with 2.42 GW reported as operating and 11.3 GW not yet operating. 10 MW AI data center project is one of them.

BrightRay has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 29 October 2026 at 06:04 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Indiana

Full market dataset & site-level records

Open 10 MW AI data center project and 657 other data centers

This page is the public summary. Start a 7-day trial or sign in to see 10 MW AI data center project on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates 10 MW AI data center project?

10 MW AI data center project is recorded under BrightRay. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is 10 MW AI data center project?

In Indiana, Indiana. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does 10 MW AI data center project have?

10 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by w.media. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.