AnalystAIReal Assets Start free trial

← United States data centers · Flexential (49) · North Carolina (36)

Live market record, the source behind every published figure

Flexential in North Carolina:3 data center sites.

As of 11 November 2026, Real Assets tracks 3 data center sites listed under Flexential in North Carolina: 3 operating and 0 planned or under construction. North Carolina accounts for 6% of Flexential's 49 tracked sites in the United States, and Flexential accounts for 8% of the 36 tracked sites in North Carolina.

Unlock all 3 Flexential sites in North Carolina
Flexential · North CarolinaUnited States data center
3

3 operating · 0 planned · 8% of North Carolina

  • 6% of Flexential in United States
  • #6 in North Carolina
🔒Pin details & exact coordinates locked · Unlock Flexential in North Carolina

Mapped Flexential sites in North Carolina (highlighted) against all North Carolina sites

Instant code or 1-click sign-in:
3Flexential sites in North Carolina
3operating in North Carolina
0planned or under construction
8%of North Carolina sites tracked

Flexential across United States

Top operators in North Carolina

Flexential in North Carolina: 3 data centers with their own page

Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.

Locked regional footprint & primary filings

View all 3 Flexential sites in North Carolina, government permit PDFs & MW timeline - enter work email

Unlock every Flexential facility in North Carolina on the interactive map with exact parcel coordinates, operating vs. planned MW by phase, and primary regulatory filings.

Instant 6-digit code or 1-click work sign-in (no password):

Full market dataset & site-level records

Unlock all 3 Flexential data center sites in North Carolina

Inspect every Flexential facility in North Carolina on the interactive map, with site-by-site capacity, status, and primary source links.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

How this data is built

Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

How this data is built and what a source line means

Questions

How many data center sites does Flexential have in North Carolina?

3 tracked as of 11 November 2026: 3 operating and 0 planned or under construction. That is 6% of Flexential's 49 tracked sites in the United States.

How does Flexential rank among data center operators in North Carolina?

Flexential ranks number 6 in North Carolina by sites tracked, with 3 of the 36 sites recorded in North Carolina (8%).

Where else does Flexential operate in the United States?

Flexential has 49 tracked sites across the United States: Oregon (7), Utah (7), Colorado (5), Georgia (5), Texas (5).

Where does the data come from?

Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.

See every site, operator and source

This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.

Open the data centers data