← United States data centers · All cities · All sites
City market record, every site links to its sources
Lenexa, Kansas:3 data centers.
As of 19 November 2026, Real Assets records 3 published data centers in Lenexa, Kansas: 3 operating and 0 planned or under construction. Top operators by sites in Lenexa: DataBank (3).
Open Lenexa on the map View the site records3 operating · 0 planned · 1 operators
- DataBank (3)
Mapped Lenexa and Kansas site positions (exact coordinates require sign-in)
Other top United States data center cities
- Ashburn
Virginia · 56 operating, 8 planned · 449.6 MW operating · 432 MW planned64 sites - Dallas
Texas · 35 operating, 15 planned · 5.9 MW operating · 5.07 GW planned50 sites - Chicago
Illinois · 24 operating, 14 planned · 276.4 MW operating · 1.04 GW planned38 sites - Santa Clara
California · 31 operating, 4 planned · 362.1 MW operating · 160 MW planned35 sites - Atlanta
Georgia · 27 operating, 7 planned · 331.1 MW operating · 120 MW planned34 sites - Phoenix
Arizona · 17 operating, 6 planned · 316 MW operating · 257 MW planned23 sites
All 3 data centers in Lenexa, Kansas
- DataBank Kansas City MCI3
DataBank, operatingNot recorded - DataBank Pine Ridge KC2
DataBank, operatingNot recorded - DataBank South Lake KC1
DataBank, operatingNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Locked Lenexa site records
View all 3 Lenexa data centers with their sources and sourced figures - enter work email
Unlock exact parcel coordinates, phase-by-phase MW delivery schedules, operator ownership, and primary regulatory filings across Lenexa, Kansas.
Full market dataset & site-level records
Unlock all 3 Lenexa data centers on the interactive map
This page summarizes the 3 published data centers in Lenexa, Kansas. Sign in or start the 3-day preview to inspect exact map coordinates, power and area figures, ownership records and source documents.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
How many data centers are tracked in Lenexa?
3 published data centers in Lenexa, Kansas as of 19 November 2026: 3 operating and 0 planned or under construction. Counts reflect sourced facilities recorded in Real Assets, not a full census.
Which operators run data centers in Lenexa?
Named operators in Lenexa by sites tracked: DataBank (3).
How much capacity is reported in Lenexa?
No capacity total is reported across the Lenexa sites yet. Real Assets does not estimate missing figures.
Where do the Lenexa figures come from?
Every site listed on this page links to its individual facility record and the original company pages, regulatory filings and press releases that published its facts.