← United States data centers · All cities · Colorado · All sites
City market record, every site links to its sources
Centennial, Colorado:4 data centers, 20 MW operating.
As of 19 November 2026, Real Assets records 4 published data centers in Centennial, Colorado: 4 operating and 0 planned or under construction. Reported capacity: 20 MW operating across 2 of 4 sites. Top operators by sites in Centennial: DataBank (2), Equinix (1), Flexential (1).
Open Centennial on the map View the site records4 operating · 0 planned · 3 operators
- DataBank (2)
- Equinix (1)
- Flexential (1)
Mapped Centennial and Colorado site positions (exact coordinates require sign-in)
Operators in Centennial
3 named operators across 4 sites in Centennial.
All 4 data centers in Centennial, Colorado
- DataBank Centennial (DEN5)
DataBank, operating16 MW - DataBank Centennial (DEN2)
DataBank, operating4 MW - Equinix DE1 Denver
Equinix, operatingNot recorded - Flexential Denver (Arapahoe)
Flexential, operatingNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Locked Centennial site records
View all 4 Centennial data centers with their sources and sourced figures - enter work email
Unlock exact parcel coordinates, phase-by-phase MW delivery schedules, operator ownership, and primary regulatory filings across Centennial, Colorado.
Full market dataset & site-level records
Unlock all 4 Centennial data centers on the interactive map
This page summarizes the 4 published data centers in Centennial, Colorado. Sign in or start the 3-day preview to inspect exact map coordinates, power and area figures, ownership records and source documents.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
How many data centers are tracked in Centennial?
4 published data centers in Centennial, Colorado as of 19 November 2026: 4 operating and 0 planned or under construction. Counts reflect sourced facilities recorded in Real Assets, not a full census.
Which operators run data centers in Centennial?
Named operators in Centennial by sites tracked: DataBank (2), Equinix (1), Flexential (1).
How much capacity is reported in Centennial?
Reported capacity: 20 MW operating across 2 of 4 sites.
Where do the Centennial figures come from?
Every site listed on this page links to its individual facility record and the original company pages, regulatory filings and press releases that published its facts.