AnalystAIReal Assets Start free trial

← Europe data centers · All sites · Norway

Sourced site record, every fact links to its page

Undheim:data center in Time municipality, Norway.

Undheim is a planned data center in Time municipality, Norway, listed under Green Mountain. Planned capacity is 100 MW according to Green Mountain Data Center. Real Assets links 1 source page, including Green Mountain Data Center.

Open this site on the map View permit PDFs & MW timeline
Time municipality, NorwayGreen Mountain
100 MW

planned data center · 1 linked source

  • Green Mountain
  • Time municipality
  • Norway
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Norway peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
100 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Norway has 16 data centers on record in Real Assets, with 621.4 MW reported as operating and 879 MW not yet operating. Undheim is one of them.

Green Mountain has 9 data centers on record in Europe: 8 operating and 1 planned or under construction. See Green Mountain in Norway (8 sites).

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

  • The Economic Impact of Undheim - Green Mountain Data Center
    Green Mountain Data Center, greenmountain.no, published 20 August 2026
    Web page
  • Government permit PDFs, regulatory filings & municipal zoning records (Time municipality, Norway)
    Air/water permits, substation filings, tax abatements & site plans
    🔒 Permit PDFs
  • Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
    Audited facility timeline and transaction history for Undheim
    🔒 MW timeline

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Undheim - enter work email

Unlock the complete facility dossier for Undheim (Time municipality, Norway): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

More Green Mountain data centers in Norway

Green Mountain data centers in other countries

Other data centers in Norway

Full site dossier & Europe dataset

Unlock Undheim permit PDFs, MW timeline & 511 other data centers

This page is the public summary for Undheim in Time municipality, Norway. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Undheim
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Green Mountain in Norway

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Undheim?

Undheim is recorded under Green Mountain. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Undheim?

In Time municipality, Norway. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Undheim have?

100 MW, as stated by Green Mountain Data Center. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Green Mountain Data Center. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.