TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20):data center in Dublin, Ireland.

TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20) is an operating data center in Dublin, Ireland, listed under ByteDance. Capacity is 80 MW according to TikTok / ByteDance / Echelon Data Centres. Real Assets links 1 source page, including TikTok / ByteDance / Echelon Data Centres.

Open this site on the map View permit PDFs & MW timeline
Dublin, IrelandByteDance
80 MW

operating data center · 1 linked source

  • ByteDance
  • Dublin
  • Ireland
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Ireland peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
80 MWcapacity
Operatingstatus
1source page linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Ireland has 31 data centers on record in Real Assets, with 1.65 GW reported as operating and 814 MW not yet operating. TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20) is one of them.

ByteDance has 1 data center in Europe with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20) - enter work email

Unlock the complete facility dossier for TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20) (Dublin, Ireland): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

Other data centers in Ireland

Full site dossier & Europe dataset

Unlock TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20) permit PDFs, MW timeline & 511 other data centers

This page is the public summary for TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20) in Dublin, Ireland. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20)
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for ByteDance in Ireland

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20)?

TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20) is recorded under ByteDance. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20)?

In Dublin, Ireland. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does TikTok Dublin Project Clover Data Center (Echelon DUB10/DUB20) have?

80 MW, as stated by TikTok / ByteDance / Echelon Data Centres. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by TikTok / ByteDance / Echelon Data Centres. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.