AnalystAIReal Assets Start free trial

← Europe data centers · All sites

Sourced site record, every fact links to its page

S+B Gruppe NIMB Bucharest Data Center:data center in Bucharest, Romania.

S+B Gruppe NIMB Bucharest Data Center is a planned data center in Bucharest, Romania, listed under S+B Gruppe. Planned capacity is 12 MW according to Data Center Dynamics. Real Assets links 1 source page, including Data Center Dynamics.

Open this site on the map View permit PDFs & MW timeline
Bucharest, RomaniaS+B Gruppe
12 MW

planned data center · 1 linked source

  • S+B Gruppe
  • Bucharest
  • Romania
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Romania peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
12 MWplanned capacity
Plannedstatus
1source page linked
2028expected completion

Facts on record

  • OperatorS+B Gruppe
  • City and countryBucharest, Romania
  • Statusplanned
  • Planned capacity12 MW, as stated by Data Center Dynamics
  • Expected completion2028
  • Sources linked1 from 1 publisher
  • Record updated4 November 2026
  • Exact parcel coordinates & street address🔒 View on parcel map
  • Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
  • Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 3 data centers in Romania that have a page.

S+B Gruppe has 1 data center on record in Europe: 0 operating and 1 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for S+B Gruppe NIMB Bucharest Data Center - enter work email

Unlock the complete facility dossier for S+B Gruppe NIMB Bucharest Data Center (Bucharest, Romania): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

Other data centers in Romania

Full site dossier & Europe dataset

Unlock S+B Gruppe NIMB Bucharest Data Center permit PDFs, MW timeline & 511 other data centers

This page is the public summary for S+B Gruppe NIMB Bucharest Data Center in Bucharest, Romania. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for S+B Gruppe NIMB Bucharest Data Center
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for S+B Gruppe in Romania

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates S+B Gruppe NIMB Bucharest Data Center?

S+B Gruppe NIMB Bucharest Data Center is recorded under S+B Gruppe. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is S+B Gruppe NIMB Bucharest Data Center?

In Bucharest, Romania. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does S+B Gruppe NIMB Bucharest Data Center have?

12 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.