AnalystAIReal Assets Start free trial

← Europe data centers · All sites · Germany

Sourced site record, every fact links to its page

Hetzner Falkenstein Data Center Park (FSN1):data center in Falkenstein, Germany.

Hetzner Falkenstein Data Center Park (FSN1) is an operating data center in Falkenstein, Germany, listed under Hetzner Online. Capacity is 80 MW according to Hetzner Online. Real Assets links 1 source page, including Hetzner Online.

Open this site on the map View permit PDFs & MW timeline
Falkenstein, GermanyHetzner Online
80 MW

operating data center · 1 linked source

  • Hetzner Online
  • Falkenstein
  • Germany
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Germany peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
80 MWcapacity
Operatingstatus
1source page linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Germany has 90 data centers on record in Real Assets, with 1.26 GW reported as operating and 1.44 GW not yet operating. Hetzner Falkenstein Data Center Park (FSN1) is one of them.

Hetzner Online has 3 data centers on record in Europe: 3 operating and 0 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Hetzner Falkenstein Data Center Park (FSN1) - enter work email

Unlock the complete facility dossier for Hetzner Falkenstein Data Center Park (FSN1) (Falkenstein, Germany): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

More Hetzner Online data centers in Germany

Hetzner Online data centers in other countries

Other data centers in Germany

Full site dossier & Europe dataset

Unlock Hetzner Falkenstein Data Center Park (FSN1) permit PDFs, MW timeline & 511 other data centers

This page is the public summary for Hetzner Falkenstein Data Center Park (FSN1) in Falkenstein, Germany. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Hetzner Falkenstein Data Center Park (FSN1)
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Hetzner Online in Germany

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Hetzner Falkenstein Data Center Park (FSN1)?

Hetzner Falkenstein Data Center Park (FSN1) is recorded under Hetzner Online. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Hetzner Falkenstein Data Center Park (FSN1)?

In Falkenstein, Germany. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Hetzner Falkenstein Data Center Park (FSN1) have?

80 MW, as stated by Hetzner Online. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Hetzner Online. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.