AnalystAIReal Assets Start free trial

← Europe data centers · All sites · Switzerland

Sourced site record, every fact links to its page

Green Metro-Campus Zurich West (Lupfig):data center in Lupfig, Switzerland.

Green Metro-Campus Zurich West (Lupfig) is an operating data center in Lupfig, Switzerland, listed under Green Datacenter. Capacity is 80 MW according to Green.ch. Real Assets links 4 source pages, including Green Datacenter, Green.ch.

Open this site on the map View permit PDFs & MW timeline
Lupfig, SwitzerlandGreen Datacenter
80 MW

operating data center · 4 linked sources

  • Green Datacenter
  • Lupfig
  • Switzerland
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Switzerland peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
80 MWcapacity
Operatingstatus
4source pages linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Switzerland has 13 data centers on record in Real Assets, with 249 MW reported as operating and 146 MW not yet operating. Green Metro-Campus Zurich West (Lupfig) is one of them.

Green Datacenter has 2 data centers on record in Europe: 2 operating and 0 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 14:50 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

  • Grosskunden
    Green Datacenter, greendatacenter.ch, published 11 September 2026
    Web page
  • Green Metro-Campus Zurich West (Lupfig) 80 MW Swiss Hyperscale & Colocation Campus
    Green.ch, greendatacenter.ch, published 15 February 2025
    Web page
  • 2 additional source filings & extracted fact citations for Green Metro-Campus Zurich West (Lupfig)
    Full source ledger and verbatim fact quotes in workspace
    🔒 Source ledger
  • Government permit PDFs, regulatory filings & municipal zoning records (Lupfig, Switzerland)
    Air/water permits, substation filings, tax abatements & site plans
    🔒 Permit PDFs
  • Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
    Audited facility timeline and transaction history for Green Metro-Campus Zurich West (Lupfig)
    🔒 MW timeline

4 sources on record; 2 shown above and 2 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 4 government permit PDFs, source filings & MW timeline for Green Metro-Campus Zurich West (Lupfig) - enter work email

Unlock the complete facility dossier for Green Metro-Campus Zurich West (Lupfig) (Lupfig, Switzerland): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

More Green Datacenter data centers in Switzerland

Other data centers in Switzerland

Full site dossier & Europe dataset

Unlock Green Metro-Campus Zurich West (Lupfig) permit PDFs, MW timeline & 511 other data centers

This page is the public summary for Green Metro-Campus Zurich West (Lupfig) in Lupfig, Switzerland. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Green Metro-Campus Zurich West (Lupfig)
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 4 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Green Datacenter in Switzerland

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Green Metro-Campus Zurich West (Lupfig)?

Green Metro-Campus Zurich West (Lupfig) is recorded under Green Datacenter. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Green Metro-Campus Zurich West (Lupfig)?

In Lupfig, Switzerland. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Green Metro-Campus Zurich West (Lupfig) have?

80 MW, as stated by Green.ch. Operating capacity today is not recorded.

Where does this information come from?

From 4 linked pages by Green Datacenter, Green.ch. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.