AWS Drogheda Campus:data center in Drogheda, Ireland.

AWS Drogheda Campus is an operating data center in Drogheda, Ireland, listed under Amazon. Capacity is 90 MW according to Amazon Web Services / An Bord Pleanála. Real Assets links 1 source page, including Amazon Web Services / An Bord Pleanála.

Open this site on the map View permit PDFs & MW timeline
Drogheda, IrelandAmazon
90 MW

operating data center · 1 linked source

  • Amazon
  • Drogheda
  • Ireland
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Ireland peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
90 MWcapacity
Operatingstatus
1source page linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Ireland has 31 data centers on record in Real Assets, with 1.65 GW reported as operating and 814 MW not yet operating. AWS Drogheda Campus is one of them.

Amazon has 10 data centers on record in Europe: 9 operating and 1 planned or under construction. See Amazon in Ireland (6 sites).

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for AWS Drogheda Campus - enter work email

Unlock the complete facility dossier for AWS Drogheda Campus (Drogheda, Ireland): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

More Amazon data centers in Ireland

Amazon data centers in other countries

Other data centers in Ireland

Full site dossier & Europe dataset

Unlock AWS Drogheda Campus permit PDFs, MW timeline & 511 other data centers

This page is the public summary for AWS Drogheda Campus in Drogheda, Ireland. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for AWS Drogheda Campus
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Amazon in Ireland

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates AWS Drogheda Campus?

AWS Drogheda Campus is recorded under Amazon. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is AWS Drogheda Campus?

In Drogheda, Ireland. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does AWS Drogheda Campus have?

90 MW, as stated by Amazon Web Services / An Bord Pleanála. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Amazon Web Services / An Bord Pleanála. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.