Live market record, the source behind every published figure
Global bauxite and alumina operators:ranked by sites tracked.
As of 28 October 2026, Alcoa has the most bauxite and alumina sites tracked in Global (8), then Chalco (8) and Rio Tinto (8). The list ranks operators by sites tracked, not by nameplate capacity.
Unlock all 70 sitesHow to read this list
- Ranked by sites tracked, not by nameplate capacity. A site counts once, under the name its source gives. Another ranking may use capacity or area and order the same names differently.
- Operating is a site that is open. Planned is a site that is not open yet: announced, planned or under construction. The two are shown in separate columns and are never added together.
- Counts are sites recorded, not a census of the bauxite and alumina market in Global, and they grow as coverage grows. Nameplate capacity is reported for only some sites, so a blank means not reported, not zero.
| Rank | Operator | Sites tracked | Operating sites | Planned sites | Nameplate capacity operating | Nameplate capacity planned |
|---|---|---|---|---|---|---|
| 1 | Alcoa | 8 | 7 | 0 | 57 nameplate capacity | not reported |
| 2 | Chalco | 8 | 7 | 1 | 26 nameplate capacity | 1 nameplate capacity |
| 3 | Rio Tinto | 8 | 6 | 2 | 79 nameplate capacity | 28 nameplate capacity |
| 4 | Rusal | 7 | 5 | 1 | 5 nameplate capacity | 5 nameplate capacity |
| 5 | Hindalco | 5 | 5 | 0 | 12 nameplate capacity | not reported |
| 6 | China Hongqiao Group | 2 | 1 | 1 | 14 nameplate capacity | 2 nameplate capacity |
| 7 | Emirates Global Aluminium | 2 | 2 | 0 | 16 nameplate capacity | not reported |
| 8 | Ma'aden | 2 | 2 | 0 | 6 nameplate capacity | not reported |
| 9 | NALCO | 2 | 2 | 0 | 9 nameplate capacity | not reported |
| 10 | Norsk Hydro | 2 | 2 | 0 | 16 nameplate capacity | not reported |
| 11 | SMB-Winning Consortium | 2 | 1 | 1 | 65 nameplate capacity | 1 nameplate capacity |
| 12 | South32 | 2 | 2 | 0 | 24 nameplate capacity | not reported |
| 13 | Vinacomin | 2 | 2 | 0 | 1 nameplate capacity | not reported |
| 14 | Alufer Mining | 1 | 1 | 0 | 6 nameplate capacity | not reported |
| 15 | Canyon Resources | 1 | 0 | 1 | not reported | 6 nameplate capacity |
| 16 | CBG | 1 | 1 | 0 | 19 nameplate capacity | not reported |
| 17 | Duc Giang Chemicals | 1 | 0 | 1 | not reported | 2 nameplate capacity |
| 18 | Eurasian Resources Group | 1 | 1 | 0 | 2 nameplate capacity | not reported |
| 19 | General Alumina Jamaica (Jamalco) | 1 | 1 | 0 | 1 nameplate capacity | not reported |
| 20 | Inalum | 1 | 1 | 0 | 1 nameplate capacity | not reported |
Full market dataset & site-level records
Unlock all 70 Global bauxite and alumina sites and 15 sourced figures
This page lists the largest operators by sites tracked. Sign in or start a trial to inspect every facility, 29 operators and the source document behind each figure.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
Instant sign-in with a 6-digit email code or single sign-on. No password required.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 28 October 2026; this page was built on 28 October 2026 at 15:36 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How are Global bauxite and alumina operators ranked?
By sites tracked: the number of sites Real Assets has recorded under each operator's name, as the source gives it. It is not a ranking by nameplate capacity, so a list ranked that way can put the same names in a different order. Operating is a site that is open. Planned is a site that is not open yet: announced, planned or under construction. They are shown in separate columns and never added together.
Is this a full list of bauxite and alumina operators in Global?
No. It shows the 20 named operators with the most sites tracked, out of 29 named operators recorded. Counts are sites Real Assets has recorded, not a census of the bauxite and alumina market in Global. A site whose source names no operator is not attributed to anyone.
What do operating and planned mean?
Operating is a site that is open. Planned is a site that is not open yet: announced, planned or under construction. They are shown in separate columns and never added together.