← Asia-Pacific data centers · All sites · Malaysia
Sourced site record, every fact links to its page
Bridge Data Centres 100MW campus in Johor - Johor:data center in Johor, Malaysia.
Bridge Data Centres 100MW campus in Johor - Johor is an operating data center in Johor, Malaysia, listed under Bridge Data Centres. Capacity is 100 MW according to www.mingtiandi.com. Real Assets links 1 source page, including mingtiandi.com.
Open this site on the map View permit PDFs & MW timelineoperating data center · 1 linked source
- Bridge Data Centres
- Johor
- Malaysia
Approximate metro position & Malaysia peer sites (exact coordinates require sign-in)
Facts on record
- OperatorBridge Data Centres
- City and countryJohor, Malaysia
- Statusoperating
- Capacity100 MW, as stated by www.mingtiandi.com
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated9 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Malaysia has 60 data centers on record in Real Assets, with 2.15 GW reported as operating and 3.43 GW not yet operating. Bridge Data Centres 100MW campus in Johor - Johor is one of them.
Bridge Data Centres has 5 data centers on record in Asia-Pacific: 3 operating and 2 planned or under construction. See Bridge Data Centres in Malaysia (4 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Logos, Bridge Data Centres Team With Locals on Malaysia Projects - Mingtiandi
www.mingtiandi.com, published 4 June 2024Web page - Government permit PDFs, regulatory filings & municipal zoning records (Johor, Malaysia)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Bridge Data Centres 100MW campus in Johor - Johor🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Bridge Data Centres 100MW campus in Johor - Johor - enter work email
Unlock the complete facility dossier for Bridge Data Centres 100MW campus in Johor - Johor (Johor, Malaysia): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More Bridge Data Centres data centers in Malaysia
- BDC MY06 (Johor Bahru)
Kulai, Malaysia, operating508 MW - Mah Sing DC Hub@ Southville City
Bangi, Malaysia, planned500 MW - BDC MY03
Kuala Lumpur, Malaysia, operating16 MW
Bridge Data Centres data centers in other countries
- Bridge Data Centres Thailand Campus
Chonburi, Thailand, planned200 MW
Other data centers in Malaysia
- GDS Nusajaya Tech Park Data Center Campus
Iskandar Puteri, Malaysia, operating662 MW - DayOne Kempas
Johor Bahru, Malaysia, operating590.4 MW - YTL Green Data Centre Park
Kulai, Malaysia, under construction500 MW - Vantage data center campus - Johor
Johor, Malaysia, planned300 MW - Vantage JHB1
Kulai, Malaysia, operating300 MW - KUL2 (Cyberjaya Campus)
Cyberjaya, Malaysia, under construction256 MW
Full site dossier & Asia-Pacific dataset
Unlock Bridge Data Centres 100MW campus in Johor - Johor permit PDFs, MW timeline & 563 other data centers
This page is the public summary for Bridge Data Centres 100MW campus in Johor - Johor in Johor, Malaysia. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Bridge Data Centres 100MW campus in Johor - Johor
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Bridge Data Centres in Malaysia
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Bridge Data Centres 100MW campus in Johor - Johor?
Bridge Data Centres 100MW campus in Johor - Johor is recorded under Bridge Data Centres. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Bridge Data Centres 100MW campus in Johor - Johor?
In Johor, Malaysia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Bridge Data Centres 100MW campus in Johor - Johor have?
100 MW, as stated by www.mingtiandi.com. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by mingtiandi.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.